{"title":"Concreting SWMS \u0026 Site Safety Documents","description":"\u003ch1\u003eSafe Work Method Statements Available for Australian Concreting Contractors\u003c\/h1\u003e\n\u003cp\u003eConstruction Safety Wise provides Australian construction companies with important health and safety documents for work sites. We take the stress out of workplace compliance by quickly providing the necessary documentation to ensure safe work practices are met at all times. \u003c\/p\u003e\n\u003cp\u003eWe provide Safe Work Method Statement (SWMS) documentation to Australian concreting business. All of our documents are downloadable immediately in order to save you time and allow you to stay focused on getting the job done in a safe and compliant manner.\u003c\/p\u003e\n\u003ch2\u003eFill out a request form to find out more or receive further assistance with your documents\u003c\/h2\u003e\n\u003cp\u003eOur aim is to provide workplace compliance products that are easy to read, understand and implement on your worksite. We have over 25 years of experience in the construction industry and develop all our documentation in accordance with each state and territory legislation.\u003c\/p\u003e\n\u003cp\u003eSimply fill in our \u003ca href=\"https:\/\/www.constructionsafetywise.com.au\/pages\/contact-us\"\u003erequest form\u003c\/a\u003e and we will get back to you with a site-specific SWMS template for concreting that will help you meet your onsite compliance needs. Once you have approved the template and inducted your workers in the required safe work procedures, you are ready to continue with the job at hand. \u003c\/p\u003e\n\u003cp\u003eConstruction Safety Wise – taking the stress out of workplace compliance.\u003c\/p\u003e","products":[{"product_id":"compliance-management-system","title":"Risk Assessment \u0026 Compliance Management System","description":"\u003cp\u003e\u003cspan\u003eOur Risk Assessment and Compliance Management system comes with a 60 page instruction manual to assist you with compliance on a daily basis. The manual is packed with Forms, Registers, and Checklists for supervisors, foreman's and managers to carry out their daily or periodical reporting and record keeping for compliance purposes.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eForms, Registers \u0026amp; Checklists include:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSite Safety Risk Assessment Checklist (comprehensive hazard ID list)\u003c\/li\u003e\n\u003cli\u003eJob Safety Assessment\/Analysis (JSA)\u003c\/li\u003e\n\u003cli\u003eRisk Assessment (with Risk Matrix)\u003c\/li\u003e\n\u003cli\u003eSupervisor Inspection Checklist\u003c\/li\u003e\n\u003cli\u003eSWMS BLANK TEMPLATE (Blank Safe Work Method Statement)\u003c\/li\u003e\n\u003cli\u003ePre-Start Meeting Form\u003c\/li\u003e\n\u003cli\u003eToolbox Meeting Form\u003c\/li\u003e\n\u003cli\u003eTraining Register\u003c\/li\u003e\n\u003cli\u003eSite Induction Register\u003c\/li\u003e\n\u003cli\u003ePlant \u0026amp; Equipment Register\u003c\/li\u003e\n\u003cli\u003eElectrical Plant \u0026amp; Equipment Register\u003c\/li\u003e\n\u003cli\u003eVehicle Register\u003c\/li\u003e\n\u003cli\u003eHazardous Chemical Register\u003c\/li\u003e\n\u003cli\u003eVerification of Competency (VOC) Form\u003c\/li\u003e\n\u003cli\u003eHigh Risk Work License Register (cranes, boom lifts(ewp) \u0026gt;11m reach etc.)\u003c\/li\u003e\n\u003cli\u003eIncident Report Form \u003c\/li\u003e\n\u003cli\u003eEmergency Equipment Register\u003c\/li\u003e\n\u003cli\u003ePersonal Protective Equipment PPE\u003c\/li\u003e\n\u003cli\u003eDaily Site Register (sign-in\/sign-out)\u003c\/li\u003e\n\u003cli\u003eSite Contractors Work Register (sign-in\/sign-out)\u003c\/li\u003e\n\u003cli\u003eConfined Space - Permit to Work\u003c\/li\u003e\n\u003cli\u003eHot Works - Permit to Work\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Management Process\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Identification Worksheet\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Discomfort survey\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Assessment Worksheet\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Controls\u003c\/li\u003e\n\u003cli\u003eControlling MSD risks through design\u003c\/li\u003e\n\u003cli\u003eCompliance Action Required (Action Plan Checklist)\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10181445059,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26954120902,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26954120966,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26954121030,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26954121094,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26954121158,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26954121222,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26954121286,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/CMS_Label_220x311_109ea132-29dd-45d2-94c8-c8d54bb70de2.png?v=1472765064"},{"product_id":"concrete-works-including-excavation-works-swms","title":"Concreting Works (including Excavation Works) SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliant procedure for Concreting works including concrete footings, slabs and excavation work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours!  Let us know if you would like your logo added.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10231206787,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28234911622,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28234911686,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28234911814,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28234911878,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28234912006,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28234912070,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28234912134,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETING_WORKS_-_LABEL_2.1.png?v=1472904091"},{"product_id":"hazardous-chemicals-swms","title":"Hazardous Chemicals (Safe Use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe use of hazardous chemicals including safety data sheets (SDS).\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277854275,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28465413830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28465413894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28465413958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28465414022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28465414086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28465414150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28465414214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HAZARDOUS_CHEMICLAS_SAFE_USE_-_LABEL_2.1.png?v=1473076881"},{"product_id":"confined-spaces-swms","title":"Confined Spaces SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step procedure for working in confined spaces.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278098691,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28240949510,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28240949574,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28240949638,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28240949702,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28240949766,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28240949830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28240949894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONFINED_SPACES_-_LABEL_2.1.png?v=1472904088"},{"product_id":"scaffold-safe-use-of-scaffold-above-4m-high-swms","title":"Scaffold (Safe Use of Scaffold above 4m high) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a safety compliance procedure for using scaffolding above 4m erected by a licensed scaffolder. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279201731,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28983757894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28983757958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28983758022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28983758150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28983758214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28983758278,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28983758342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_SCAFFOLD_SAFE_USE_OF_SCAFFOLD_ABOVE_4M_-_LABEL_2.1.png?v=1473508900"},{"product_id":"working-in-outdoor-environments-swms","title":"Working in Outdoor Environments SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for working in an outdoor environment. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are included\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279567619,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29015796038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29015796102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29015796166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29015796230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29015796294,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29015796358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29015796422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_IN_OUTDOOR_ENVIRONMENTS_-_LABEL_2.1.png?v=1473508897"},{"product_id":"working-near-powered-mobile-plant-swms","title":"Working Near Powered Mobile Plant SWMS","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Working Near Powered Mobile Plant Safe Work Method Statement (SWMS)\u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eis written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279618371,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29016547718,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29016547782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29016547846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29016547910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29016547974,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29016548102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29016548166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_POWERED_MOBILE_PLANT_-_LABEL_2.1.png?v=1473508896"},{"product_id":"working-near-overhead-powerlines-swms","title":"Working Near Powerlines and Utility Services","description":"\u003cp\u003e\u003cspan\u003eThis Working near powerlines and utility Services Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working near overhead powerlines and utility services.  It is written for \u003c\/span\u003e\u003cspan\u003ethe construction industry with clear job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279665475,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29021691334,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29021691526,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29021691654,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29021691782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29021691910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29021692038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29021692166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_OVERHEAD_POWERLINES_-_LABEL_2.1.png?v=1473508904"},{"product_id":"electrical-equipment-portable-swms","title":"Portable Electrical Equipment (All Trades) SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliant procedure for the safe use of portable electrical equipment.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26070586118,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28247500230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28247500358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28247500422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28247500486,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28247500550,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28247500614,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28247500742,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_EQUIPMENT_PORTABLE_-_LABEL_2.1.png?v=1472904089"},{"product_id":"concretors-safety-pack","title":"Concretors Safety Pack","description":"\u003cp\u003eWork Health and Safety \u003cstrong\u003eCompliance for\u003c\/strong\u003e \u003cstrong\u003eResidential and Commercial Concreters\u003c\/strong\u003e. Included in your pack is a Site Safety Plan, SWMS (Pack of 11) and Compliance Management System. The SWMS have been selected to assist you achieve on site compliance on a daily basis.\u003ci\u003e  \u003c\/i\u003e\u003c\/p\u003e\n\u003cp\u003eAll you have to do is fill out your business and project details, induct your workers and you are READY TO GO!  \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eDetailed List of SWMS included in the Safety Pack\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFormwork (suspended Floors)\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eConcrete Slab on Ground Preparation\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eConcrete Placement and Finishing\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eConcrete Pumping\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eScaffold (Safe Use)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eOperating Elevating Work Platform (EWP)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"line-height: 1.4;\"\u003eWorking in Outdoor Environments \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003eWorking Near Powerlines and Utility Services\u003c\/li\u003e\n\u003cli\u003eWorking Near Powered Mobile Plant\u003c\/li\u003e\n\u003cli\u003ePlatform Ladders\u003c\/li\u003e\n\u003cli\u003eSilica Dust (RCS) Working with or near respirable crystalline silica\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003e* Additional SWMS can be purchased individually\u003c\/strong\u003e \u003c\/em\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26482304966,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26482825478,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31118876492,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31191287308,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31251010444,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":20650824859751,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":20650824892519,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":20650825515111,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/CONCRETERS_SAFETY_PACKS_LABEL.jpg?v=1556729564"},{"product_id":"site-safety-plan-concretors","title":"Site Safety Plan - Concreters","description":"\u003cp\u003eIf you are a self employed contractor or supervisor managing construction projects, we understand the importance you place on providing a safe and healthy work environment for the welfare of all your workers and any visitors to your site.  This comprehensive yet user friendly \u003cstrong\u003eSite Safety Plan\u003c\/strong\u003e will help you carry out your day to day health and safety compliance obligations.      \u003c\/p\u003e\n\u003cp\u003eThe SSP includes your Health and Safety Policy - including Environmental \u0026amp; Rehabilitation Policies for onsite management, Safe Work Procedures which is your Health and Safety compliance instruction and information for onsite management, and project information forms to complete for site specific requirements.\u003c\/p\u003e\n\u003cp\u003eThe SSP is in accordance with your State\/Territory Legislation and Australian Standards. All you need to do is make sure that it remains site specific, and that all of your workers are inducted into the SSP policy and procedures and you are READY TO GO!  \u003c\/p\u003e\n\u003col\u003e\u003c\/ol\u003e\n\u003cp\u003e\u003cspan style=\"color: #ff0000;\"\u003e\u003cstrong\u003e\u003cspan style=\"color: #0000ff;\"\u003e\u003cem\u003eTO PURCHASE YOUR SELECTED PRODUCT...CLICK ON \u003cspan style=\"color: #ff0000;\"\u003e'ADD TO CART'\u003c\/span\u003e\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26951134278,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26951134342,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26951134406,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26951134470,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26951134534,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26951134662,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26951134726,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26951134854,"sku":"","price":195.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/CONCRETERS_SITE_SAFETY_PLANS_LABEL.jpg?v=1556729568"},{"product_id":"concreting-slab-on-ground-preparation-swms","title":"Concreting slab on ground preparation SWMS","description":"\u003cp\u003eOur concreting slab on ground preparation SWMS is construction industry compliant and ready to use onsite!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! \u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31248816652,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31248816716,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31248816780,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31248816844,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31248817036,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249159628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249169420,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":702750982156,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_SLAB_ON_GROUND_PREP_-_LABEL_2.1.png?v=1480162068"},{"product_id":"concreting-pumping-swms","title":"Concrete Pumping SWMS","description":"\u003cp\u003e\u003cspan\u003eOur concrete pumping SWMS is construction industry compliant and ready to use onsite!\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #ff0000;\"\u003e\u003cstrong\u003eSave 50% when you buy the Concretors Safety Pack!\u003c\/strong\u003e\u003c\/span\u003e \u003cstrong\u003eWhy not be fully compliant as well as saving on your spend.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31249385164,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31249385228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31249385292,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31249385356,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31249385420,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249385484,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249385548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31249649932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_PUMPING_-_LABEL_2.1.png?v=1480162072"},{"product_id":"concrete-placement-finishing-swms","title":"Concrete Placement and Finishing Work SWMS","description":"\u003cp\u003eOur concrete placement and finishing work SWMS is construction industry compliant and ready to use onsite!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls and reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31249775628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31249775692,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31249775756,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31249775820,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31249775884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249775948,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249776012,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31249797900,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_PLACEMENT_FINISHING_-_LABEL_2.1.png?v=1480162069"},{"product_id":"formwork-suspended-slabs-swms","title":"Formwork (suspended concrete floors) SWMS","description":"\u003cp\u003eOur formwork SWMS is construction industry compliant and ready to use onsite! \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31250263564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31250263628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31250263692,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31250263756,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31250263820,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31250263884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31250263948,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31250264012,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_FORMWORK_CONSTRUCTION_-_LABEL_2.1.png?v=1480162070"},{"product_id":"hot-works-swms","title":"Hot Works - SWMS - Welding Grinding Soldering","description":"\u003cp\u003eThis Hot Works Safe Work Method Statement (SWMS) covers all common hazards and risk controls associated with Hot Works. Workers are required to be competent in carrying out specific hot works tasks, which may include - welding, grinding, soldering, cutting steel with a grinder, or using an oxy-acetylene. Hot works permits are also used to ensure that the hot works are authorised and safe to proceed before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/p\u003e\n\u003cp\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/p\u003e\n\u003cp\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/p\u003e\n\u003cp\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. Ensure that the hazards are checked against the hazards listed in the SWMS and list any high-risk construction work hazards which are not included. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":34529109068,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":34529312140,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":34529312204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34529312268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34529312332,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34529312396,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34529312460,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34529312524,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HOT_WORKS_-_LABEL_2.1.png?v=1487401473"},{"product_id":"cement-rendering-swms","title":"Cement Rendering SWMS","description":"\u003cp\u003eThis Cement Rendering Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":43520988044,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":12485497225319,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":19499950768231,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19499950932071,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19499951063143,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19499951423591,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19499951554663,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19499951587431,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CEMENT_RENDERING_LABEL.jpg?v=1547001593"},{"product_id":"bored-piers-working-on-near-bored-pier-holes-swms","title":"Bored Piers (Working on\/near Bored Pier holes) SWMS","description":"\u003cp\u003eThis \u003cstrong\u003eBored Piers (Working on\/near Bored Pier holes) SWMS\u003c\/strong\u003e is written for the construction industry.  It has clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow on site.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"VIC","offer_id":274168578060,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1556557365260,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29271123165287,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":29273721077863,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29273732251751,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29273742245991,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29273750863975,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29273751847015,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_BORED_PIERS_Working_on_or_near_Pier_holes_220x330_jpg.jpg?v=1510647700"},{"product_id":"concrete-pumping-line-pumping-swms","title":"Concrete Pumping (Line Pumping) SWMS","description":"\u003cp\u003e\u003cspan\u003eOur concrete line pumping SWMS is construction industry compliant and ready to use onsite!\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":1511815512076,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1511815544844,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1511815577612,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1511815610380,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1511815643148,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1511815675916,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1511815708684,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1511815741452,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETING_PUMPING_LINE_PUMP_-_LABEL_2.1.jpg?v=1515835012"},{"product_id":"operating-an-excavator-swms","title":"Operating an Excavator SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for Operating an Excavator. All common high risk construction work (HRCW) hazards and risk controls have been included. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":12494712635495,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":12494712668263,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":12494712701031,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":12494712733799,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":12494712766567,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":12494712799335,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":12494712832103,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":12494712864871,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_OPERATING_AN_EXCAVATOR_-_LABEL_2.1.jpg?v=1546670399"},{"product_id":"lifting-materials-with-rope-pulley-gin-wheel-swms","title":"Lifting Materials with Rope \u0026 Pulley (Gin Wheel) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS has been developed for cement renderers, bricklayers and other trades that use a material lifting (rope \u0026amp; pulley) system to lift materials to upper levels of the scaffolding or buildings, and is construction industry compliant and ready to use onsite! I\u003c\/span\u003ef you require more information about SWMS inclusions please call 1300 881 928.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! \u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":19477217443943,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19477217476711,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19495512080487,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":19495513292903,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19495513784423,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19495513948263,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19495514046567,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19495514112103,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_Lifting_Materials_with_Rope_Pulley_Gin_Wheel.jpg?v=1546669984"},{"product_id":"working-near-energised-electrical-installations-swms","title":"Working near Energised Electrical Installations SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working near energised electrical installations. All common high risk construction work (HRCW) hazards and required risk controls have been included. If you require further information about inclusions, please call 1300 881 928.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19485696655463,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19485696688231,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485696720999,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485696753767,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485696786535,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485696819303,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485696852071,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485696884839,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_ENERGISED_ELECTRICAL_INSATLLATIONS.jpg?v=1546677159"},{"product_id":"laser-level-operation-safe-operation-swms","title":"Laser Level Operation (Safe Operation) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for safe operation of a laser level. All common high risk construction work (HRCW) hazards and required risk controls have been included. If you require further information about inclusions please call 1300 881 928.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19485908238439,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19485908271207,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485908303975,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485908336743,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485908369511,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485908402279,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485908435047,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485908467815,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_LASER_LEVEL_Safe_Operation.jpg?v=1546677177"},{"product_id":"manual-handling-swms","title":"Manual Handling SWMS","description":"\u003cp\u003eOur Manual Handling SWMS is construction industry compliant and ready to use onsite! It covers all common manual handling hazards and required risk controls. If you require more details of the SWMS inclusions before you purchase, please call 1300 881 928\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":19485929996391,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485930029159,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485930061927,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485930094695,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485930127463,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485930160231,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485930192999,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":42528260391102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_MANUAL_HANDLING_general_tasks_on_a_construction_site.jpg?v=1546677156"},{"product_id":"truck-crane-operation","title":"SWMS - Truck Crane Operation","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for Operating a Truck Crane on a construction site. \u003c\/span\u003e\u003c\/span\u003eAll common high risk construction work (HRCW) hazards and risk controls have been included. If you require more information about the SWMS inclusions, please call 1300881928.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":20341369962599,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":20341369995367,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":20341370028135,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":20341370060903,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":20341370093671,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":20341370126439,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":20341370159207,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":20341370191975,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS160_-_TRUCK_CRANE_OPERATION.jpg?v=1554374027"},{"product_id":"quick-cut-concrete-saw-safe-operation-swms","title":"Quick Cut Concrete Saw (Safe Operation) SWMS","description":"\u003cp\u003eThis Quick Cut Concrete Saw SWMS is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow on site.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":20906803953767,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":20906818666599,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":20906820403303,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":20906821091431,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":20906821714023,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":20906822238311,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":20906823483495,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":20906823778407,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_QUICK_CUT_CONCRETE_SAW_SAFE_OPERATION.jpg?v=1559563643"},{"product_id":"operating-powered-mobile-plant-near-pedestrians","title":"Operating Powered mobile plant near pedestrians","description":"\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Operating powered mobile plant near pedestrians Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\n\u003cp\u003eassociated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":43096283513022,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":43096283545790,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43096283578558,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43096283611326,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43096283644094,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43096283676862,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43096283709630,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43096283742398,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/SWMS_-_WORKING_NEAR_POWERED_MOBILE_PLANT_-_LABEL_2.1_5e65473d-2b13-4b91-a820-c9e7205f0d97.png?v=1695697436"},{"product_id":"concrete-pumping-boom-pump-swms","title":"Concrete Pumping (Boom pump) SWMS","description":"\u003cp\u003e\u003cspan\u003eOur concrete boom pump SWMS is construction industry compliant and ready to use onsite!\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":43333988155582,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":43333988188350,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43333988221118,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43333988253886,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43333988286654,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43333988319422,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43333988352190,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43333988384958,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/SWMSConcretepumping_boompump.jpg?v=1700610512"},{"product_id":"operating-material-lifter-duct-work-swms","title":"Operating a Material Lifter - Duct work SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS has been developed the safe operation of a material lifter - duct work! I\u003c\/span\u003ef you require more information about SWMS inclusions please call 1300 881 928.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":43472499507390,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43472499540158,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43472499572926,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":43472499605694,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43472499638462,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43472499671230,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43472499703998,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43472499736766,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/Operatingamateriallifter.png?v=1706016256"},{"product_id":"loading-unloading-skip-bin-safe-operation","title":"Loading and unloading a Skip Bin (safe operation) SWMS","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Loading and unloading a skip bin Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003eassociated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":43472573464766,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":43472573497534,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43472573530302,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43472573563070,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43472573595838,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43472573628606,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43472573661374,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43472573694142,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/Loading-and-unloading-a-skip-bin-from-a-tip-truck.jpg?v=1706016249"},{"product_id":"swms-truck-crane-operation-copy","title":"SWMS - Mobile Crane Operation","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for Mobile Crane Operation on a construction site. \u003c\/span\u003e\u003c\/span\u003eAll common high risk construction work (HRCW) hazards and risk controls have been included. If you require more information about the SWMS inclusions, please call 1300881928.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":44620866420926,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":44620866453694,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":44620866486462,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":44620866519230,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":44620866551998,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":44620866584766,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":44620866617534,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":44620866650302,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/MOBILECRANE-2.jpg?v=1728512454"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/collections\/CONCRETORS_-_LABEL_239x245_92a26c18-b019-4791-88a9-e3c18f970cb3.jpg?v=1563498008","url":"https:\/\/www.constructionsafetywise.com.au\/collections\/concretors-swms-site-safety-documents\/excavator-operation.oembed","provider":"Construction Safety Wise","version":"1.0","type":"link"}