{"title":"Electrical SWMS \u0026 Site Safety Documents","description":"\u003ch1\u003eBuy Your Electrical Safe Work Method Statements Here\u003c\/h1\u003e\n\u003cp\u003eConstruction Safety Wise provides Australian construction companies with Safe Work Method Statements (SWMS) and Site Safety Plans to ensure workplace compliance with current health and safety regulations. We have over 25 years of experience in the construction industry and have developed an effective system for fast-tracking compliance documents to businesses so that they can get back to completing the job in a safe and healthy environment.  \u003c\/p\u003e\n\u003cp\u003eWe take the hassle and stress out of providing worksite health and safety documents. Simply click on electrician product label and purchase your Safe Work Method Statement and\/or Site Safety Plan. Then all you need to do is approve the template, induct your staff and you’re good to go.  \u003c\/p\u003e\n\u003ch2\u003eContact us for further information\u003c\/h2\u003e\n\u003cp\u003eIf you would like to find out more about our electrical SWMS and Site Safety Plan documentation in NSW, Vic or beyond, fill out to and request documentation from our contact page. We will respond in a timely manner with all the required information for your electrical business.\u003c\/p\u003e\n\u003cp\u003eConstruction Safety Wise is a leading provider of workplace health and safety documentation, so take the stress out of organising them by purchasing our ready to use documents for your business right here.\u003c\/p\u003e","products":[{"product_id":"compliance-management-system","title":"Risk Assessment \u0026 Compliance Management System","description":"\u003cp\u003e\u003cspan\u003eOur Risk Assessment and Compliance Management system comes with a 60 page instruction manual to assist you with compliance on a daily basis. The manual is packed with Forms, Registers, and Checklists for supervisors, foreman's and managers to carry out their daily or periodical reporting and record keeping for compliance purposes.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eForms, Registers \u0026amp; Checklists include:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eSite Safety Risk Assessment Checklist (comprehensive hazard ID list)\u003c\/li\u003e\n\u003cli\u003eJob Safety Assessment\/Analysis (JSA)\u003c\/li\u003e\n\u003cli\u003eRisk Assessment (with Risk Matrix)\u003c\/li\u003e\n\u003cli\u003eSupervisor Inspection Checklist\u003c\/li\u003e\n\u003cli\u003eSWMS BLANK TEMPLATE (Blank Safe Work Method Statement)\u003c\/li\u003e\n\u003cli\u003ePre-Start Meeting Form\u003c\/li\u003e\n\u003cli\u003eToolbox Meeting Form\u003c\/li\u003e\n\u003cli\u003eTraining Register\u003c\/li\u003e\n\u003cli\u003eSite Induction Register\u003c\/li\u003e\n\u003cli\u003ePlant \u0026amp; Equipment Register\u003c\/li\u003e\n\u003cli\u003eElectrical Plant \u0026amp; Equipment Register\u003c\/li\u003e\n\u003cli\u003eVehicle Register\u003c\/li\u003e\n\u003cli\u003eHazardous Chemical Register\u003c\/li\u003e\n\u003cli\u003eVerification of Competency (VOC) Form\u003c\/li\u003e\n\u003cli\u003eHigh Risk Work License Register (cranes, boom lifts(ewp) \u0026gt;11m reach etc.)\u003c\/li\u003e\n\u003cli\u003eIncident Report Form \u003c\/li\u003e\n\u003cli\u003eEmergency Equipment Register\u003c\/li\u003e\n\u003cli\u003ePersonal Protective Equipment PPE\u003c\/li\u003e\n\u003cli\u003eDaily Site Register (sign-in\/sign-out)\u003c\/li\u003e\n\u003cli\u003eSite Contractors Work Register (sign-in\/sign-out)\u003c\/li\u003e\n\u003cli\u003eConfined Space - Permit to Work\u003c\/li\u003e\n\u003cli\u003eHot Works - Permit to Work\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Management Process\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Identification Worksheet\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Discomfort survey\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Assessment Worksheet\u003c\/li\u003e\n\u003cli\u003eHazardous Manual Tasks – Risk Controls\u003c\/li\u003e\n\u003cli\u003eControlling MSD risks through design\u003c\/li\u003e\n\u003cli\u003eCompliance Action Required (Action Plan Checklist)\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10181445059,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26954120902,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26954120966,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26954121030,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26954121094,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26954121158,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26954121222,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26954121286,"sku":"","price":186.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/CMS_Label_220x311_109ea132-29dd-45d2-94c8-c8d54bb70de2.png?v=1472765064"},{"product_id":"asbestos-drilling-holes-swms","title":"Asbestos – Drilling Holes SWMS","description":"\u003cp\u003eThis SWMS provides a step by step compliant procedure for drilling holes in asbestos.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277433731,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26347097414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26347097478,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26347097542,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26347097606,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26347097670,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26347097734,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26347097862,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ASBESTOS_-_DRILLING_HOLES_IN_ASBESTOS_LABEL_2.1.png?v=1472765060"},{"product_id":"hazardous-chemicals-swms","title":"Hazardous Chemicals (Safe Use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe use of hazardous chemicals including safety data sheets (SDS).\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277854275,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28465413830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28465413894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28465413958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28465414022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28465414086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28465414150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28465414214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HAZARDOUS_CHEMICLAS_SAFE_USE_-_LABEL_2.1.png?v=1473076881"},{"product_id":"confined-spaces-swms","title":"Confined Spaces SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step procedure for working in confined spaces.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278098691,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28240949510,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28240949574,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28240949638,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28240949702,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28240949766,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28240949830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28240949894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONFINED_SPACES_-_LABEL_2.1.png?v=1472904088"},{"product_id":"copy-of-mobile-scaffold-safe-use-on-concrete-floor-hard-surface-swms","title":"Mobile Scaffold (Safe use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe use of mobile scaffold on a concrete floor or hard surface.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls and reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278265859,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28886310086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28886310150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28886310214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28886310278,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28886310342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28886310406,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28886310470,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_MOBILE_SCAFFOLD_SAFE_USE_-_LABEL_2.1.png?v=1473422498"},{"product_id":"ewp-elevating-work-platform-swms","title":"EWP Elevating Work Platform SWMS","description":"\u003cp\u003eThis elevating work platform (EWP) Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks, associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279055235,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28262296838,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28262296966,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28262297094,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28262297222,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28262297350,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28262297414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28262297542,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELEVATING_WORK_PLATFORM_EWP_-_LABEL_2.1.png?v=1547001456"},{"product_id":"scaffold-safe-use-of-scaffold-above-4m-high-swms","title":"Scaffold (Safe Use of Scaffold above 4m high) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a safety compliance procedure for using scaffolding above 4m erected by a licensed scaffolder. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279201731,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28983757894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28983757958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28983758022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28983758150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28983758214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28983758278,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28983758342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_SCAFFOLD_SAFE_USE_OF_SCAFFOLD_ABOVE_4M_-_LABEL_2.1.png?v=1473508900"},{"product_id":"working-in-outdoor-environments-swms","title":"Working in Outdoor Environments SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for working in an outdoor environment. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are included\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279567619,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29015796038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29015796102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29015796166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29015796230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29015796294,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29015796358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29015796422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_IN_OUTDOOR_ENVIRONMENTS_-_LABEL_2.1.png?v=1473508897"},{"product_id":"working-near-powered-mobile-plant-swms","title":"Working Near Powered Mobile Plant SWMS","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Working Near Powered Mobile Plant Safe Work Method Statement (SWMS)\u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eis written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279618371,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29016547718,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29016547782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29016547846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29016547910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29016547974,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29016548102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29016548166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_POWERED_MOBILE_PLANT_-_LABEL_2.1.png?v=1473508896"},{"product_id":"working-near-overhead-powerlines-swms","title":"Working Near Powerlines and Utility Services","description":"\u003cp\u003e\u003cspan\u003eThis Working near powerlines and utility Services Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working near overhead powerlines and utility services.  It is written for \u003c\/span\u003e\u003cspan\u003ethe construction industry with clear job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279665475,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29021691334,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29021691526,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29021691654,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29021691782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29021691910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29021692038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29021692166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_OVERHEAD_POWERLINES_-_LABEL_2.1.png?v=1473508904"},{"product_id":"working-on-a-roof-general-works-swms","title":"Working on a Roof (General Works) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working on a roof (general works). \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279712835,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29030077830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29030077894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29030077958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29030078022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29030078086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29030078150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29030078214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_ON_A_ROOF_GENERAL_WORKS_-_LABEL_2.1.png?v=1473508902"},{"product_id":"site-safety-plan-electricians","title":"Site Safety Plan - Electricians","description":"\u003cp\u003eIf you are a self employed contractor or supervisor managing construction projects, we understand the importance you place on providing a safe and healthy work environment for the welfare of all your workers and any visitors to your site.  This comprehensive yet user friendly Electricians \u003cstrong\u003eSite Safety Plan\u003c\/strong\u003e - policies and procedures will help you carry out your day to day health and safety compliance obligations.      \u003c\/p\u003e\n\u003cp\u003eThe SSP includes your Health and Safety Policy - including Environmental \u0026amp; Rehabilitation Policies for onsite management, Safe Work Procedures which is your Health and Safety compliance instruction and information for onsite management, and project information forms to complete for site specific requirements.\u003c\/p\u003e\n\u003cp\u003eThe SSP is in accordance with your State Legislation and Australian Standards. All you need to do is make sure that it remains site specific, and that all of your workers are inducted into the SSP policy and procedures and you are READY TO GO!  \u003c\/p\u003e\n\u003col\u003e\u003c\/ol\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"color: #0000ff;\"\u003e\u003cem\u003eTO PURCHASE YOUR SELECTED PRODUCT...CLICK ON \u003cspan style=\"color: #ff0000;\"\u003e'ADD TO CART'\u003c\/span\u003e\u003c\/em\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"VIC","offer_id":23848302790,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":19645950230631,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19645950820455,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19645952786535,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19645953704039,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19645954687079,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19645956096103,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19645957406823,"sku":"","price":190.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ELECTRICIANS_SITE_SAFETY_PLAN_LABEL_2.1.png?v=1472765009"},{"product_id":"electricians-safety-pack","title":"Electricians Safety Pack","description":"\u003cp\u003eWork Health \u0026amp; Safety \u003cstrong\u003eCompliance for\u003c\/strong\u003e \u003cstrong\u003eResidential \u0026amp; Light Commercial Electricians\u003c\/strong\u003e. Included in your pack is a Site Safety Plan, - policies and procedures, Compliance Management System - Forms, registers and checklists and SWMS (Pack of 12). The SWMS have been selected to assist you achieve on site compliance on a daily basis.\u003ci\u003e  \u003c\/i\u003e\u003c\/p\u003e\n\u003cp\u003eAll you have to do is fill out your business and project details, induct your workers and you are READY TO GO!  \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eDetailed List of SWMS included in the Pack\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e*Ladders (safe use) *Install Cable-Trench Conduit-Pits *Install Conduit in Walls and Ceilings *Install Conduit to Under Slab (pre-concrete pour) *Sub-Mains and Sub-Circuits Rough-in Work *Install Sub-Mains and Sub-Circuits *Installation of Switchboard *Installation of Switchboard Connections *Installation of Mains Power *Installation of Power and Light Cabling *Installation of Power Points and Light Fittings; Electrical Isolation and Lockout\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cstrong\u003e* Additional SWMS can be purchased individually\u003c\/strong\u003e \u003c\/em\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"VIC","offer_id":25391639302,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":31100170124,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31100224268,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31114876620,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19645969334375,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19645969694823,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19645970088039,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19645970415719,"sku":"","price":594.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ELECTRICIANS_SAFETY_PACK_LABEL.png?v=1479848492"},{"product_id":"install-electrical-cable-trench-conduit-pits-swms","title":"Install Electrical Cable Trench Conduit and Pits - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical cable, trench conduit and pits.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25392387526,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645964296204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645964361740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645964427276,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645964525580,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645964754956,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645964918796,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645965148172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CABLE_TRENCH_CONDUIT_PITS_-_LABEL_2.1.png?v=1473163301"},{"product_id":"install-electrical-conduit-under-slab-pre-concrete-pour-swms","title":"Install Electrical Conduit under slab (pre-concrete pour) - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical conduit under concrete slabs at preparation stage.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25393379590,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645996802060,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645997031436,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645997621260,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645997719564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645997752332,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645997916172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645998374924,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CONDUIT_UNDER_SLAB_PRE-CONCRETE_POUR_-_LABEL_2.1.png?v=1473163299"},{"product_id":"electrical-sub-mains-and-sub-circuits-rough-in-swms","title":"Electrical Sub-Mains and Sub-Circuits Rough-in  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for electrical sub-mains and sub-circuits rough-in work. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394448902,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31117491148,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31117501516,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31117505228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19495804043367,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19495804141671,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19495804174439,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19495804567655,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_SUB-MAINS_SUB-CIRCUITS_ROUGH-IN_-_LABEL_2.1.png?v=1479884326"},{"product_id":"install-electrical-sub-mains-and-sub-circuits-swms","title":"Install Electrical Sub-Mains and Sub-Circuits  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical sub-mains and sub-circuits.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394630662,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645939654668,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645940375564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645940506636,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645940539404,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645940604940,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645942472716,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645943816204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_SUB-MAINS_SUB-CIRCUITS_-_LABEL_2.1.png?v=1473249680"},{"product_id":"installation-of-electrical-switchboard-swms","title":"Install Electrical Switchboard  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing an electrical switchboard.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394761478,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1680127393804,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1680127754252,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1680128311308,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1680129982476,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1680132276236,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1680136273932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1680137289740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_SWITCHBOARD_-_LABEL_2.1.png?v=1473336093"},{"product_id":"installation-of-electrical-switchboard-connections-swms","title":"Installation of Electrical Switchboard Connections","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for connection work on an electrical switchboard.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394919430,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1637374328844,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1637375836172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1637377048588,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1637385338892,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1637389041676,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1637391433740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1637396807692,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_SWITCHBOARD_CONNECTION_WORK_-_LABEL_2.1.png?v=1473336089"},{"product_id":"installation-of-electrical-mains-power-swms","title":"Install Electrical Mains Power  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical mains power.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395043654,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1680181788684,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1680182444044,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1680182902796,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1680183427084,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1680183721996,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1680184967180,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1680185262092,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_MAINS_POWER_-_LABEL_2.1.png?v=1473336092"},{"product_id":"installation-of-electrical-power-and-light-cabling-swms","title":"Install Electrical Power and Light Cabling  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical power and light cabling.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003c\/span\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395240710,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1697691828236,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1697713422348,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1697722728460,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1697726758924,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1697731280908,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1697736294412,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1697742880780,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_POWER_LIGHT_CABLING_-_LABEL_2.1.png?v=1473282845"},{"product_id":"ladders-electricians-safe-use-swms","title":"Ladders - Electricians (safe use)  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for the safe use of a non-conductive electricians Ladder.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395514950,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28884855174,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1637637095436,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1637643616268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1637644238860,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1637648498700,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1637649743884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1637654593548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_LADDERS_ELECTRICIANS_SAFE_USE_-_LABEL_2.1.png?v=1473422493"},{"product_id":"electrical-equipment-portable-swms","title":"Portable Electrical Equipment (All Trades) SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliant procedure for the safe use of portable electrical equipment.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26070586118,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28247500230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28247500358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28247500422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28247500486,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28247500550,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28247500614,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28247500742,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_EQUIPMENT_PORTABLE_-_LABEL_2.1.png?v=1472904089"},{"product_id":"install-electrical-conduit-in-walls-and-ceilings-swms","title":"Install Electrical Conduit in Walls and Ceilings - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical conduit in walls and ceiling areas.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":28795967366,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1636668637196,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1636687773708,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1636705763340,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1636707008524,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1636708188172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1636712185868,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1636713103372,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CONDUIT_IN_WALLS_CEILINGS_-_LABEL_2.1.png?v=1473336094"},{"product_id":"hot-works-swms","title":"Hot Works - SWMS - Welding Grinding Soldering","description":"\u003cp\u003eThis Hot Works Safe Work Method Statement (SWMS) covers all common hazards and risk controls associated with Hot Works. Workers are required to be competent in carrying out specific hot works tasks, which may include - welding, grinding, soldering, cutting steel with a grinder, or using an oxy-acetylene. Hot works permits are also used to ensure that the hot works are authorised and safe to proceed before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/p\u003e\n\u003cp\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/p\u003e\n\u003cp\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/p\u003e\n\u003cp\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. Ensure that the hazards are checked against the hazards listed in the SWMS and list any high-risk construction work hazards which are not included. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":34529109068,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":34529312140,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":34529312204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34529312268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34529312332,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34529312396,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34529312460,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34529312524,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HOT_WORKS_-_LABEL_2.1.png?v=1487401473"},{"product_id":"operating-an-excavator-swms","title":"Operating an Excavator SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for Operating an Excavator. All common high risk construction work (HRCW) hazards and risk controls have been included. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":12494712635495,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":12494712668263,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":12494712701031,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":12494712733799,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":12494712766567,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":12494712799335,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":12494712832103,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":12494712864871,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_OPERATING_AN_EXCAVATOR_-_LABEL_2.1.jpg?v=1546670399"},{"product_id":"install-roof-plumbing-pipework-flashings-swms","title":"Install Roof Plumbing Pipework Flashings SWMS","description":"\u003cp\u003eT\u003cspan\u003ehis Install Roof Plumbing Pipework Flashings Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/span\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business.\u003c\/p\u003e\n\u003cp\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/p\u003e\n\u003cp\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/p\u003e\n\u003cp\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eOur Construction Safety SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. Ensure all high-risk construction work hazards are checked against the hazards listed in the SWMS and if not included it is your responsibility to add them.  Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19477151744103,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19477151776871,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19477151809639,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19477151842407,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19477151875175,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19477151907943,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19477151940711,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19477151973479,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_Install_Roof_Plumbing_Pipework_Flashings.jpg?v=1546677172"},{"product_id":"working-near-energised-electrical-installations-swms","title":"Working near Energised Electrical Installations SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working near energised electrical installations. All common high risk construction work (HRCW) hazards and required risk controls have been included. If you require further information about inclusions, please call 1300 881 928.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19485696655463,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19485696688231,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485696720999,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485696753767,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485696786535,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485696819303,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485696852071,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485696884839,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_ENERGISED_ELECTRICAL_INSATLLATIONS.jpg?v=1546677159"},{"product_id":"assembly-and-installation-of-shoring-boxes-swms","title":"Assembly and Installation of Shoring Boxes SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for assembling and installing shoring boxes for deep trenches and pits. All common high risk construction work (HRCW) hazards and required risk controls have been included. Need more information about inclusions please call 1300 881 928.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19485724573799,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19485724606567,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485724639335,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485724672103,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485724704871,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485724737639,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485724770407,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485724803175,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ASSEMBLY_INSATLLATION_OF_SHORING_BOXES.jpg?v=1546677161"},{"product_id":"laser-level-operation-safe-operation-swms","title":"Laser Level Operation (Safe Operation) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for safe operation of a laser level. All common high risk construction work (HRCW) hazards and required risk controls have been included. If you require further information about inclusions please call 1300 881 928.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19485908238439,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19485908271207,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485908303975,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485908336743,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485908369511,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485908402279,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485908435047,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485908467815,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_LASER_LEVEL_Safe_Operation.jpg?v=1546677177"},{"product_id":"manual-handling-swms","title":"Manual Handling SWMS","description":"\u003cp\u003eOur Manual Handling SWMS is construction industry compliant and ready to use onsite! It covers all common manual handling hazards and required risk controls. If you require more details of the SWMS inclusions before you purchase, please call 1300 881 928\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":19485929996391,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19485930029159,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19485930061927,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19485930094695,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19485930127463,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19485930160231,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19485930192999,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":42528260391102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_MANUAL_HANDLING_general_tasks_on_a_construction_site.jpg?v=1546677156"},{"product_id":"installation-of-power-points-and-light-fittings-swms","title":"Install Electrical Power Points and Light Fittings  SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite for the installation of electrical power points and light fittings.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":19495748567143,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19495748599911,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":19495748632679,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19495748665447,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19495748698215,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19495748730983,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19495748763751,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19495748796519,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_POWER_POINTS_LIGHT_FITTINGS_-_LABEL_2.1_278c59f8-dd9a-4aaa-ac9e-88f74d42c073.png?v=1547019938"},{"product_id":"operating-powered-mobile-plant-near-pedestrians","title":"Operating Powered mobile plant near pedestrians","description":"\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Operating powered mobile plant near pedestrians Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\n\u003cp\u003eassociated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":43096283513022,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":43096283545790,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43096283578558,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43096283611326,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43096283644094,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43096283676862,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43096283709630,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43096283742398,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/SWMS_-_WORKING_NEAR_POWERED_MOBILE_PLANT_-_LABEL_2.1_5e65473d-2b13-4b91-a820-c9e7205f0d97.png?v=1695697436"},{"product_id":"loading-unloading-skip-bin-safe-operation","title":"Loading and unloading a Skip Bin (safe operation) SWMS","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Loading and unloading a skip bin Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and \u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003eassociated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":43472573464766,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":43472573497534,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":43472573530302,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":43472573563070,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":43472573595838,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":43472573628606,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":43472573661374,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":43472573694142,"sku":null,"price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/files\/Loading-and-unloading-a-skip-bin-from-a-tip-truck.jpg?v=1706016249"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/collections\/ELECTRICIANS_-_LABEL_239x245_f4b779cb-9ffd-432e-b418-16e703d80c55.jpg?v=1563498036","url":"https:\/\/www.constructionsafetywise.com.au\/collections\/electricians-swms-site-safety-documents\/power-saw.oembed","provider":"Construction Safety Wise","version":"1.0","type":"link"}