{"title":"Safe Work Method Statements - SWMS","description":"\u003ch1\u003eProviding Construction Companies with Safe Work Method Statements\u003c\/h1\u003e\n\u003cp\u003eConstruction Safety Wise is an organisation focused on providing compliant safety documents, such as Safe Work Method Statements that will enable any construction business to achieve safe work practices on every worksite, as well as fulfil State compliance obligations.\u003c\/p\u003e\n\u003cp\u003eWe want to free up the stress related tasks of workplace compliance documentation, so that you and your staff can get back to the job at hand.\u003c\/p\u003e\n\u003cp\u003eIf you want to write your own SWMS (DIY), just request our free Safe Work Method Statement templates which we provide to construction companies in NSW, QLD, Vic, and all other states and territories. Simply fill our request form and we will send you the free SWMS template asap.\u003c\/p\u003e\n\u003ch2\u003eFill out our request form to receive a free Quote for site specific Safe Work Method Statements (SWMS)\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/www.constructionsafetywise.com.au\/pages\/contact-us\" title=\"Quote Request Form\"\u003eClick here for a free Quote! \u003c\/a\u003e\u003c\/p\u003e","products":[{"product_id":"cladding-soffit-eaves-installation-swms","title":"Cladding and Soffit\/Eaves Installation SWMS","description":"\u003cp\u003eThis c\u003cspan\u003eladding and soffit\/eaves installation \u003c\/span\u003eSafe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10231142595,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28231740998,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28231741126,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28231741254,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28231741318,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28231741446,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28231741574,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28231741702,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CLADDING_SOFFIT_EAVES_INSTALLATION_-_LABEL_2.1.png?v=1547001990"},{"product_id":"concrete-works-including-excavation-works-swms","title":"Concreting Works (including Excavation Works) SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliant procedure for Concreting works including concrete footings, slabs and excavation work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours!  Let us know if you would like your logo added.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10231206787,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28234911622,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28234911686,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28234911814,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28234911878,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28234912006,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28234912070,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28234912134,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETING_WORKS_-_LABEL_2.1.png?v=1472904091"},{"product_id":"wall-framing-timber-work-at-height-above-2m-swms-1","title":"Wall Framing - Timber (Working at Height - above 2m) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for \u003c\/span\u003e\u003cspan\u003ewall framing (working at height - above 2m).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10231856771,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29014337030,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29014337094,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29014337158,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29014337222,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29014337286,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29014337350,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29014337414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_TIMBER_WALL_FRAMES_ABOVE_2m_-_LABEL_2.1.png?v=1473508901"},{"product_id":"floor-framing-work-at-height-above-2m-swms","title":"Floor Framing (Working at Height - above 2m) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for floor framing (working at height - above 2m).\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10231914307,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28463361158,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28463361798,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28463362310,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28463362694,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28463363078,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28463363398,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28463363846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_FLOOR_FRAMING_-_LABEL_2.1.png?v=1473076884"},{"product_id":"asbestos-drilling-holes-swms","title":"Asbestos – Drilling Holes SWMS","description":"\u003cp\u003eThis SWMS provides a step by step compliant procedure for drilling holes in asbestos.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277433731,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26347097414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26347097478,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26347097542,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26347097606,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26347097670,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26347097734,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26347097862,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ASBESTOS_-_DRILLING_HOLES_IN_ASBESTOS_LABEL_2.1.png?v=1472765060"},{"product_id":"asbestos-removing-non-friable-asbestos-swms","title":"Asbestos – Removing non-friable Asbestos SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a step-by-step compliant procedure for removing non-friable Asbestos. This \u003c\/span\u003e\u003cspan\u003eSafe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277475587,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26348062214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26348062342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":26348062406,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":26348062470,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":26348062534,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":26348062598,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":26348062662,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ASBESTOS_-_REMOVING_NON-FRIABLE_ASBESTOS_LABEL_2.1.png?v=1472765033"},{"product_id":"hazardous-chemicals-swms","title":"Hazardous Chemicals (Safe Use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe use of hazardous chemicals including safety data sheets (SDS).\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10277854275,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28465413830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28465413894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28465413958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28465414022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28465414086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28465414150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28465414214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HAZARDOUS_CHEMICLAS_SAFE_USE_-_LABEL_2.1.png?v=1473076881"},{"product_id":"confined-spaces-swms","title":"Confined Spaces SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step procedure for working in confined spaces.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278098691,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28240949510,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28240949574,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28240949638,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28240949702,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28240949766,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28240949830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28240949894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONFINED_SPACES_-_LABEL_2.1.png?v=1472904088"},{"product_id":"ladders-safe-use-swms","title":"Ladders (Safe Use) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Ladders Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite. You may also require a platform ladder SWMS or Electricians Ladder SWMS so please continue browsing to find what you need. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278206275,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28882216838,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28882216902,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28882216966,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28882217030,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28882217094,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28882217222,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28882217350,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_LADDERS_SAFE_USE_-_LABEL_2.1.png?v=1473422495"},{"product_id":"copy-of-mobile-scaffold-safe-use-on-concrete-floor-hard-surface-swms","title":"Mobile Scaffold (Safe use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe use of mobile scaffold on a concrete floor or hard surface.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls and reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10278265859,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28886310086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28886310150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28886310214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28886310278,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28886310342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28886310406,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28886310470,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_MOBILE_SCAFFOLD_SAFE_USE_-_LABEL_2.1.png?v=1473422498"},{"product_id":"ewp-elevating-work-platform-swms","title":"EWP Elevating Work Platform SWMS","description":"\u003cp\u003eThis elevating work platform (EWP) Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks, associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279055235,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28262296838,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28262296966,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28262297094,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28262297222,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28262297350,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28262297414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28262297542,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELEVATING_WORK_PLATFORM_EWP_-_LABEL_2.1.png?v=1547001456"},{"product_id":"roof-framing-new-work-renovation-extensions-swms","title":"Roof Framing (Working at Height) new work renovation and extensions SWMS","description":"\u003cp\u003eThis roof framing (new work renovation and extensions) Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls and reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279131075,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28891435654,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28891435718,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28891435782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28891435846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28891435910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28891435974,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28891436038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ROOF_FRAMING_Working_at_Height_-_LABEL_2.1.png?v=1547001159"},{"product_id":"scaffold-safe-use-of-scaffold-above-4m-high-swms","title":"Scaffold (Safe Use of Scaffold above 4m high) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a safety compliance procedure for using scaffolding above 4m erected by a licensed scaffolder. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279201731,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28983757894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28983757958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28983758022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28983758150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28983758214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28983758278,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28983758342,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_SCAFFOLD_SAFE_USE_OF_SCAFFOLD_ABOVE_4M_-_LABEL_2.1.png?v=1473508900"},{"product_id":"site-set-up-demolition-swms","title":"Site Set Up and Demolition SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a step-by-step compliance procedure for site set up and demolition work. \u003c\/span\u003e\u003cspan\u003eThe \u003c\/span\u003e\u003cspan\u003eSafe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279272195,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28987308614,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28987308742,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28987308870,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28987309062,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28987309254,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28987309382,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28987309574,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_SITE_SETUP_DEMOLITION_-_LABEL_2.1.png?v=1473508903"},{"product_id":"wall-framing-timber-ground-level-swms","title":"Wall Framing - Timber (Ground level) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for timber \u003c\/span\u003e\u003cspan\u003ewall framing (at ground level).\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279516227,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29000254790,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29000254854,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29000254918,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29000254982,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29000255110,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29000255174,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29000255238,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_TIMBER_WALL_FRAMES_GROUND_LEVEL_-_LABEL_2.1.png?v=1473508898"},{"product_id":"working-in-outdoor-environments-swms","title":"Working in Outdoor Environments SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step by step compliance procedure for working in an outdoor environment. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are included\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279567619,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29015796038,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29015796102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29015796166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29015796230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29015796294,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29015796358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29015796422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_IN_OUTDOOR_ENVIRONMENTS_-_LABEL_2.1.png?v=1473508897"},{"product_id":"working-near-powered-mobile-plant-swms","title":"Working Near Powered Mobile Plant SWMS","description":"\u003cp\u003e\u003cspan\u003e\u003cspan\u003e\u003cspan\u003eThis Working Near Powered Mobile Plant Safe Work Method Statement (SWMS)\u003c\/span\u003e\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eis written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279618371,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29016547718,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29016547782,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29016547846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29016547910,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29016547974,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29016548102,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29016548166,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_NEAR_POWERED_MOBILE_PLANT_-_LABEL_2.1.png?v=1473508896"},{"product_id":"working-on-a-roof-general-works-swms","title":"Working on a Roof (General Works) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliance procedure for working on a roof (general works). \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":10279712835,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":29030077830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":29030077894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":29030077958,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":29030078022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":29030078086,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":29030078150,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":29030078214,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WORKING_ON_A_ROOF_GENERAL_WORKS_-_LABEL_2.1.png?v=1473508902"},{"product_id":"carpentry-joinery-maintenance-work","title":"Carpentry and Joinery Maintenance Work SWMS","description":"\u003cp\u003eThis SWMS provides construction safety procedures for carpentry and joinery maintenance work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":15874467846,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28226452230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28226452294,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28226452358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28226452422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28226452486,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28226452550,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28226452614,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CARPENTRY_JOINERY_MAINTENANCE_-_LABEL_2.1.png?v=1472904085"},{"product_id":"high-pressure-cleaning-equipment-swms","title":"High Pressure Cleaning Equipment (Safe Use) SWMS","description":"\u003cp\u003eThis SWMS provides a step-by-step compliance procedure for the safe operation of high-pressure cleaning equipment.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":15881813510,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28466823558,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28466823622,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28466823750,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28466823814,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28466823878,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28466823942,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28466824006,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HIGH_PRESSURE_CLEANING_EQUIPMENT_SAFE_USE_-_LABEL_2.1.png?v=1473076884"},{"product_id":"cabinet-makers-cabinet-installation-swms","title":"Joinery and Cabinet Installation SWMS","description":"\u003cp\u003eNew house or house renovation work usually requires installation of cabinets.  This SWMS provides a step-by-step safety compliance procedure for joinery work and your cabinet installation work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":15913367558,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28872574470,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28872574662,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28872574790,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28872574918,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28872575046,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28872575110,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28872575238,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CABINET_MAKER_CABINET_INSTALLATION_-_LABEL_2.1.png?v=1473422497"},{"product_id":"plasterboard-installation-finishing-work-swms","title":"Plasterboard Installation and Finishing Work SWMS","description":"\u003cp\u003e\u003cspan\u003eThis Plasterboard Installation and Finishing Work Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite. You may also require a platform ladder SWMS so keep browsing for what you need.   \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":15915877318,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28890689414,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28890689670,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28890689926,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28890690182,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28890690438,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28890690502,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28890690630,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_PLASTERBOARD_INSTALLATION_FINISHING_WORK_-_LABEL_2.1.png?v=1473422492"},{"product_id":"fixout-carpentry-work","title":"Fixout\/Fitout Carpentry Work SWMS","description":"\u003cp\u003eThis SWMS is for internal fixout or fitout carpentry work, including fitting door jambs, architraves, skirting, hanging doors, fitting door furniture and more.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":16672228294,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28263789830,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28263789894,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28263790022,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34525513228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34525529548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34525533452,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34525539084,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_FIXOUT_CARPENTRY_-_LABEL_2.1.png?v=1472904094"},{"product_id":"install-electrical-cable-trench-conduit-pits-swms","title":"Install Electrical Cable Trench Conduit and Pits - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical cable, trench conduit and pits.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25392387526,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645964296204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645964361740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645964427276,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645964525580,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645964754956,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645964918796,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645965148172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CABLE_TRENCH_CONDUIT_PITS_-_LABEL_2.1.png?v=1473163301"},{"product_id":"install-electrical-conduit-under-slab-pre-concrete-pour-swms","title":"Install Electrical Conduit under slab (pre-concrete pour) - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical conduit under concrete slabs at preparation stage.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25393379590,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645996802060,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645997031436,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645997621260,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645997719564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645997752332,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645997916172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645998374924,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CONDUIT_UNDER_SLAB_PRE-CONCRETE_POUR_-_LABEL_2.1.png?v=1473163299"},{"product_id":"electrical-sub-mains-and-sub-circuits-rough-in-swms","title":"Electrical Sub-Mains and Sub-Circuits Rough-in  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for electrical sub-mains and sub-circuits rough-in work. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394448902,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31117491148,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31117501516,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31117505228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19495804043367,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19495804141671,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19495804174439,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19495804567655,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_SUB-MAINS_SUB-CIRCUITS_ROUGH-IN_-_LABEL_2.1.png?v=1479884326"},{"product_id":"install-electrical-sub-mains-and-sub-circuits-swms","title":"Install Electrical Sub-Mains and Sub-Circuits  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical sub-mains and sub-circuits.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394630662,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1645939654668,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1645940375564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1645940506636,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1645940539404,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1645940604940,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1645942472716,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1645943816204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_SUB-MAINS_SUB-CIRCUITS_-_LABEL_2.1.png?v=1473249680"},{"product_id":"installation-of-electrical-switchboard-swms","title":"Install Electrical Switchboard  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing an electrical switchboard.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25394761478,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1680127393804,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1680127754252,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1680128311308,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1680129982476,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1680132276236,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1680136273932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1680137289740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_SWITCHBOARD_-_LABEL_2.1.png?v=1473336093"},{"product_id":"installation-of-electrical-mains-power-swms","title":"Install Electrical Mains Power  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical mains power.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395043654,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1680181788684,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1680182444044,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1680182902796,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1680183427084,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1680183721996,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1680184967180,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1680185262092,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_MAINS_POWER_-_LABEL_2.1.png?v=1473336092"},{"product_id":"installation-of-electrical-power-and-light-cabling-swms","title":"Install Electrical Power and Light Cabling  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical power and light cabling.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003c\/span\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395240710,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1697691828236,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1697713422348,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1697722728460,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1697726758924,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1697731280908,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1697736294412,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1697742880780,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_POWER_LIGHT_CABLING_-_LABEL_2.1.png?v=1473282845"},{"product_id":"ladders-electricians-safe-use-swms","title":"Ladders - Electricians (safe use)  SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for the safe use of a non-conductive electricians Ladder.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":25395514950,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28884855174,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1637637095436,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1637643616268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1637644238860,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1637648498700,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1637649743884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1637654593548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_LADDERS_ELECTRICIANS_SAFE_USE_-_LABEL_2.1.png?v=1473422493"},{"product_id":"electrical-equipment-portable-swms","title":"Portable Electrical Equipment (All Trades) SWMS","description":"\u003cp\u003eThis Safe Work Method Statement (SWMS) provides a step-by-step compliant procedure for the safe use of portable electrical equipment.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26070586118,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":28247500230,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":28247500358,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":28247500422,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":28247500486,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":28247500550,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":28247500614,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":28247500742,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_ELECTRICAL_EQUIPMENT_PORTABLE_-_LABEL_2.1.png?v=1472904089"},{"product_id":"aluminium-window-door-installation-assemble-glaze-install-swms","title":"Aluminium Window and Door Installation (Assemble-Glaze-Install) SWMS","description":"\u003cp\u003e\u003cspan\u003eFor contractors who assemble, glaze and install aluminum door and windows onsite. This SWMS has a very clear step by step job process and all common hazards associated with door and window installation and assembly.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":26343993734,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":26343993798,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":26343993862,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34525929548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34525937292,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34525944012,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34525950604,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34525953420,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/ALUMINIUM_WINDOW_DOORS_Assemble-Glaze-Install_LABEL_2.1_220x311.png?v=1473379385"},{"product_id":"install-electrical-conduit-in-walls-and-ceilings-swms","title":"Install Electrical Conduit in Walls and Ceilings - SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides electrical safety procedures for installing electrical conduit in walls and ceiling areas.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":28795967366,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":1636668637196,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1636687773708,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1636705763340,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1636707008524,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1636708188172,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1636712185868,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1636713103372,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_INSTALL_ELECTRICAL_CONDUIT_IN_WALLS_CEILINGS_-_LABEL_2.1.png?v=1473336094"},{"product_id":"bricklaying-swms","title":"Bricklaying SWMS","description":"\u003cp\u003eThis bricklaying Safe Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS \u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31248305740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31248396620,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31248396684,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31248396748,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31248396812,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31248396876,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31248396940,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31248397068,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_BRICKLAYING_-_LABEL_2.1.png?v=1480162067"},{"product_id":"concreting-slab-on-ground-preparation-swms","title":"Concreting slab on ground preparation SWMS","description":"\u003cp\u003eOur concreting slab on ground preparation SWMS is construction industry compliant and ready to use onsite!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! \u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31248816652,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31248816716,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31248816780,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31248816844,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31248817036,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249159628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249169420,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":702750982156,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_SLAB_ON_GROUND_PREP_-_LABEL_2.1.png?v=1480162068"},{"product_id":"concreting-pumping-swms","title":"Concrete Pumping SWMS","description":"\u003cp\u003e\u003cspan\u003eOur concrete pumping SWMS is construction industry compliant and ready to use onsite!\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #ff0000;\"\u003e\u003cstrong\u003eSave 50% when you buy the Concretors Safety Pack!\u003c\/strong\u003e\u003c\/span\u003e \u003cstrong\u003eWhy not be fully compliant as well as saving on your spend.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31249385164,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31249385228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31249385292,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31249385356,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31249385420,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249385484,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249385548,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31249649932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_PUMPING_-_LABEL_2.1.png?v=1480162072"},{"product_id":"concrete-placement-finishing-swms","title":"Concrete Placement and Finishing Work SWMS","description":"\u003cp\u003eOur concrete placement and finishing work SWMS is construction industry compliant and ready to use onsite!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls and reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31249775628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31249775692,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31249775756,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31249775820,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31249775884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31249775948,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31249776012,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31249797900,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_CONCRETE_PLACEMENT_FINISHING_-_LABEL_2.1.png?v=1480162069"},{"product_id":"formwork-suspended-slabs-swms","title":"Formwork (suspended concrete floors) SWMS","description":"\u003cp\u003eOur formwork SWMS is construction industry compliant and ready to use onsite! \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31250263564,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31250263628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31250263692,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31250263756,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31250263820,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31250263884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31250263948,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31250264012,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_FORMWORK_CONSTRUCTION_-_LABEL_2.1.png?v=1480162070"},{"product_id":"waterproofing-swms","title":"Waterproofing SWMS","description":"\u003cp\u003eOur waterproofing SWMS is construction industry compliant and ready to use onsite!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":31251577996,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":31251578060,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":31251578124,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":31251578188,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":31251578252,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":31251578316,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":31251578380,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":31251578444,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WATERPROOFING_-_LABEL_2.1.jpg?v=1480162071"},{"product_id":"painting-work-below-2m-swms","title":"Painting Work (below 2m) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides a step by step safety compliance procedure for painting work below 2 metres.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":32350711372,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":32350711436,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":32350711500,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":12454467174503,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":12454467207271,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":12454467436647,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":12454469697639,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":12454469959783,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_PAINTING_WORK_below_2m_-_LABEL.jpg?v=1483772525"},{"product_id":"painting-work-above-2m-swms","title":"Painting Work (above 2m) SWMS","description":"\u003cp\u003eThis Painting Work SWMS is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for painting work above 2 metres.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on  and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eSilica Dust Risk Assessment sheet to comply with health and safety laws and Australian\/New Zealand Standards\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE \u0026amp; RPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE \u0026amp; RPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":32350908236,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":32350908364,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":32350908428,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":12454483886183,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":12454486311015,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":12454486638695,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":12454486769767,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":12454486802535,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_PAINTING_WORK_above_2m_-_LABEL.jpg?v=1483776120"},{"product_id":"trestles-painters-swms","title":"Trestles and Planks (Work Platforms) SWMS","description":"\u003cp\u003e\u003cspan\u003eThis SWMS provides safety compliance procedures for the safe use of Trestles and planks. You may also require a platform ladder SWMS or Elevating Platform SWMS so please continue browsing to find what you need. \u003c\/span\u003e\u003c\/p\u003e\n\u003ch3\u003e\n\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003cbr\u003e\n\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided on page 2, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":32617706892,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":32617706956,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":32617707020,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":32617707084,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":32617707148,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":32617707212,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":32617707276,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":32617707340,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_TRESTLES_PLANKS_WORK_PLATFORM_-_LABEL_2.1.png?v=1484370140"},{"product_id":"shower-screen-installation-swms","title":"Shower Screen Installation SWMS","description":"\u003cp\u003e\u003cspan\u003eThe Shower Screen installation SWMS Work Method Statement (SWMS) is written for the construction industry with clear step by step job tasks and associated hazard identification and risk control measures listed for workers to follow onsite.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eA HRCW checklist \u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":33081348300,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":1637763350540,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":1637765775372,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":1637767282700,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":1637769412620,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":1637773443084,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":1637775671308,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":1637776949260,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_SHOWER_SCREEN_INSTALLATION_-_LABEL.jpg?v=1485252159"},{"product_id":"wardrobe-installation-swms","title":"Wardrobe Installation SWMS","description":"\u003cp\u003e\u003cspan\u003eThe Wardrobe installation SWMS is construction industry compliant and ready to review and use onsite.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"NSW","offer_id":33081746188,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":19495794245735,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":19495794278503,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":19495794344039,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":19495794409575,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":19495794901095,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":19495794933863,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":19495794966631,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_WARDROBE_INSTALLATION_-_LABEL.jpg?v=1485252164"},{"product_id":"explosive-power-tools-ramset-hilti-guns-swms","title":"Explosive Power Tools (Powdered Actuated Tools) - SWMS","description":"\u003cp\u003eThis explosive power tools SWMS is required for operating a Ramset or Hilti Gun (powder actuated tool) on a construction site or in a workplace. It is classed as High-Risk Construction Work. Workers using this equipment must be trained and competent to use it safely, and it must be maintained fit for purpose at all times according to the manufacturer's instructions.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":34527969228,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":34528235468,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":34528235532,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34528235596,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34528235660,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34528235788,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34528235980,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34528236108,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_EXPLOSIVE_POWER_TOOLS_Ramset-Hilti_Guns.jpg?v=1487397873"},{"product_id":"hot-works-swms","title":"Hot Works - SWMS - Welding Grinding Soldering","description":"\u003cp\u003eThis Hot Works Safe Work Method Statement (SWMS) covers all common hazards and risk controls associated with Hot Works. Workers are required to be competent in carrying out specific hot works tasks, which may include - welding, grinding, soldering, cutting steel with a grinder, or using an oxy-acetylene. Hot works permits are also used to ensure that the hot works are authorised and safe to proceed before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/p\u003e\n\u003cp\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/p\u003e\n\u003cp\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/p\u003e\n\u003cp\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. Ensure that the hazards are checked against the hazards listed in the SWMS and list any high-risk construction work hazards which are not included. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":34529109068,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":34529312140,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":34529312204,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34529312268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34529312332,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34529312396,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34529312460,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34529312524,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_HOT_WORKS_-_LABEL_2.1.png?v=1487401473"},{"product_id":"blocklaying-swms","title":"Blocklaying SWMS","description":"\u003cp\u003eThis blocklaying SWMS is construction industry compliant and ready to use onsite. It covers you for all related high risk construction work activities which is required by current legislation. \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided, and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy-to-follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultraviolet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. Always review your SWMS to make sure that they are site specific. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWe specialise in construction safety; our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":34651535180,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":34651535628,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":34721663884,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":34721672268,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":34721676684,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":34721681932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":34721702860,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":34721728588,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_BLOCKLAYING.jpg?v=1487631864"},{"product_id":"trestles-planks-bricklayers-safe-use-swms","title":"Trestles and Planks - Bricklayers (safe use) SWMS","description":"\u003cp\u003eThis Trestles and planks Safe Work Method Statement (SWMS) is construction industry compliant and ready to use onsite. It covers the safe use of trestles and planks. \u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #ff0000;\"\u003e\u003cstrong\u003e*Save over 50% when you buy our Bricklayers Safety Pack. \u003cspan style=\"color: #000000;\"\u003eWhy not be fully compliant and save HEAPS at the same time!\u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHere is a list of compliance content included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eUnlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/li\u003e\n\u003cli\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/li\u003e\n\u003cli\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/li\u003e\n\u003cli\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/li\u003e\n\u003cli\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSimple and easy to use while giving your SWMS a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant!\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e  \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"VIC","offer_id":42064145932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"QLD","offer_id":699277836300,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":699381809164,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":699388887052,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":699399929868,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":699403108364,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":699416182796,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":699426930700,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_TRESTLES_PLANKS_Bricklayers.jpg?v=1512185136"},{"product_id":"plumbing-maintenance-work-swms","title":"Plumbing Maintenance Work - SWMS","description":"\u003cp\u003eThis Plumbing Maintenance Work Safe Work Method Statement (SWMS) is written for the construction industry with easy to follow step by step job tasks with hazard identification and risk control measures for each task when carrying out plumbing and maintenance work. Workers are required to be competent in carrying out specific hot works tasks, which may include - welding, grinding, soldering or using an oxy-acetylene. \u003c\/p\u003e\n\u003cp\u003e \u003cstrong\u003eContent included in this SWMS:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eA fillable PDF information page is provided where you can add site and task specific details to the SWMS\u003c\/li\u003e\n\u003cli\u003eSafe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.\u003c\/li\u003e\n\u003cli\u003eRisk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite\u003c\/li\u003e\n\u003cli\u003eJob\/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS\u003c\/li\u003e\n\u003cli\u003ePotential Hazards Identified – what may cause \u003cstrong\u003einjury\u003c\/strong\u003e (most common hazards for each task are identified in the SWMS)\u003c\/li\u003e\n\u003cli\u003eHRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.\u003c\/li\u003e\n\u003cli\u003eRisk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively\u003c\/li\u003e\n\u003cli\u003eHierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard. \u003c\/li\u003e\n\u003cli\u003eFacility for entering the position\/name of the person responsible for monitoring risk controls \u0026amp; reviewing SWMS is provided\u003c\/li\u003e\n\u003cli\u003eRisk assessment risk level for each hazard with residual\/post control risk level noted (to be reviewed onsite)\u003c\/li\u003e\n\u003cli\u003eWorker and public safety procedures are added as required\u003c\/li\u003e\n\u003cli\u003eHeat stress and Ultra violet exposure safe work procedures are added when applicable\u003c\/li\u003e\n\u003cli\u003ePersonal protective equipment (PPE)\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eMethods of monitoring risk controls are included in this SWMS\u003c\/li\u003e\n\u003cli\u003eProcess for reviewing the risk control measures are provided in this SWMS\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003cli\u003eHot works (welding, grinding, soldering)\u003c\/li\u003e\n\u003cli\u003eExplosive gas and fire hazards and risk controls\u003c\/li\u003e\n\u003cli\u003eQualifications, Training, and Duties required to achieve and maintain health and safety compliance\u003c\/li\u003e\n\u003cli\u003eInduction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite\u003c\/li\u003e\n\u003cli\u003eReview date record facility is provided – to be recorded at your pre-start or toolbox meetings\u003c\/li\u003e\n\u003cli\u003eDocument control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eAdditional benefits that you receive when purchasing our SWMS\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnlike some of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business\u003c\/p\u003e\n\u003cp\u003eWe diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS\u003c\/p\u003e\n\u003cp\u003eOur SWMS are easy to fill out on all computers and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)\u003c\/p\u003e\n\u003cp\u003ePrintable PDF – you can print of as many copies as often as you like and keep it looking professional\u003c\/p\u003e\n\u003cp\u003ePromote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eKeeping it simple, effective and easy to use with a professional look!\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eOur SWMS are developed using a fillable PDF format to make sure your documents are quick and easy to fill out. This also means that your documents will keep looking professional when opened on any computer or mobile devise.  To prepare for site, you will need to fill out the site-specific details for each project on the front page, then induct your workers into the SWMS and get them to sign off and date before starting work. You are now ready to start work knowing that your SWMS is compliant.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBecause we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant Safety Note:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eUnder current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and\/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.\u003c\/p\u003e","brand":"Construction Safety Wise","offers":[{"title":"QLD","offer_id":42406609676,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NSW","offer_id":42406609740,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"ACT","offer_id":42406609804,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"VIC","offer_id":42406609868,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"TAS","offer_id":42406609932,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"SA","offer_id":42406609996,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"WA","offer_id":42406610060,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true},{"title":"NT","offer_id":42406610124,"sku":"","price":88.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/products\/SWMS_-_PLUMBING_MAINTENANCE_WORK_220x330.jpg?v=1499238734"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0999\/3496\/collections\/SWMS_Label_220x311_decc5c08-4942-42de-8c50-b399808716ac.png?v=1563498057","url":"https:\/\/www.constructionsafetywise.com.au\/collections\/safe-work-method-statements-swms\/under-concrete-slab.oembed","provider":"Construction Safety Wise","version":"1.0","type":"link"}