Call a Safety Consultant 1300 881 928

Cart 0
Water Pipe Installation (Civil) SWMS

Water Pipe Installation - SWMS

$88.00

This Water Pipe Installation SWMS covers all common hazards and risk controls associated with water pipe installation works. Workers are required to be competent in carrying work near powered mobile plant, working in deep trenches, and all associated tasks.  

Content included in this SWMS:

  • A fillable PDF information page is provided where you can add site and task specific details to the SWMS
  • Safe Work Method Statement (SWMS) instructions are provided so that workers can easily follow them to revise the SWMS onsite if required.
  • Risk Assessment matrix (risk level chart) is provided and is simple to learn, easy to use and apply when assessing hazards and risks onsite
  • Job/Task Steps - logical and easy to follow step by step job processes are listed throughout the SWMS
  • Potential Hazards Identified – what may cause injury (most common hazards for each task are identified in the SWMS)
  • HRCW – When applicable, the most common high-risk construction work hazards are noted with the required risk controls.
  • Risk Control Measures are listed in an easy to follow format to ensure workers can implement the controls effectively
  • Hierarchy of Risk Controls are listed at the top of each page for workers to assess the risks – Eliminate the hazard, Substitute the hazard, Isolate the hazard, Engineering – reduce risk, Administration, Personal Protective Equipment (PPE)
  • Facility for entering the position/name of the person responsible for monitoring risk controls & reviewing SWMS is provided
  • Risk assessment risk level for each hazard with residual/post control risk level noted (to be reviewed onsite)
  • Worker and public safety procedures are added as required
  • Heat stress and Ultra violet exposure safe work procedures are added when applicable
  • Access to site and site induction
  • Pre-start meeting 
  • SWMS induction and sign off
  • Work Permits
  • Implement environmental risk controls
  • Clear work site area 
  • Secure construction work area
  • Unload powered mobile plant
  • Operating plant and travelling machine across site
  • Excavate trenches
  • Shoring box installation
  • Entering trench and installing pipework 
  • Install bedding material
  • Backfill trenches
  • Loading plant and machinery
  • Demobilising plant
  • Site clean-up
  • Striking underground services - hazards and risk controls
  • Chemical spills - hazards and risk controls
  • Slips trips and falls - hazards and risk controls
  • Untrained spotter - hazards and risk controls
  • Workers struck by moving parts - hazards and risk controls
  • Poor access to machine - hazards and risk controls
  • Unstable ground - hazards and risk controls
  • Slippery surface - hazards and risk controls
  • Unstable ramps - hazards and risk controls
  • Mechanical failure - hazards and risk controls
  • Operator not machine competent - hazards and risk controls
  • Open trenches - hazards and risk controls
  • Collision with vehicles hazards and risk controls
  • Falling objects hazards and risk controls
  • Falls hazards and risk controls
  • Electrocution hazards and risk controls
  • Overhead powerlines hazards and risk controls
  • Hazardous Chemicals hazards and risk controls
  • Hazardous manual tasks hazards and risk controls
  • Noise hazards hazards and risk controls
  • Dust inhalation hazards hazards and risk controls
  • Hot works (welding, grinding, soldering) hazards and risk controls
  • Explosive gas and fire hazards hazards and risk controls
  • Personal protective equipment (PPE) 
  • Qualifications, Training, and Duties required to achieve and maintain health and safety compliance
  • Induction, Consultation and sign-off Register(form) is provided – this is to record all workers who were consulted and inducted into the SWMS before starting work onsite
  • Methods of monitoring risk controls are included in this SWMS
  • Process for reviewing the risk control measures are provided in this SWMS
  • Review date record facility is provided – to be recorded at your pre-start or toolbox meetings
  • Document control – our SWMS have a document control facility with the specific SWMS document number, issue date, next review date, and Version number so that you always know if you have the correct SWMS and latest version before sending them to clients

Additional benefits that you receive when purchasing our SWMS

  • Unlike many of our competitors, our SWMS are developed specifically for each State and Territory which means that you don’t have to read through huge amounts of generic legislation that is not relevant to your business
  • We diligently monitor legislation changes and ensure that you have the latest compliance codes of practice when purchasing one of our SWMS

  •  Our SWMS are easy to fill out on all PCs and mobile devices for those who require paperless systems – you can even sign the SWMS on a mobile device (if your device has the required features or Apps installed)

  • Printable PDF – you can print of as many copies as often as you like and keep it looking professional

  •  Promote your business – our SWMS allow you to add your own business Logo and promote YOUR business not ours! Just request our free instruction sheet.

 

Because we specialise in construction safety, our SWMS have a high acceptance rate across all Australian states and territories.

Important Safety Note:

Under current legislation, a business owner is responsible for carrying out risk assessments onsite to identify all potential hazards that may harm workers and/or other persons nearby. These hazards should be checked against the hazards listed in the SWMS and all high-risk construction work hazards not listed in the SWMS must be added. Workers are to be informed and should sign off on the revised SWMS before starting work.

Keeping it simple, effective and easy to use with a professional look!

Our SWMS are developed in a fillable PDF format to make sure your documents are quick and easy to fill out while keeping a stable and professional presentation when opened on any computer or mobile devise.  Once you fill out the site-specific details on the front page, all you need to do is induct your workers and get them  signed off and you’re ready go!


More from this collection